Key West Cooling Company
HVAC Repair · Key West, FL · Source details, contact options, quote requests, and local activity

About
RealReviews profileKey West Cooling Company is an exact Key West HVAC identity rather than a generic location page. Its current site publishes 410 Avenue E, 305-912-2293, weekday hours, and service for mini-splits, central air, pool heaters, ductwork, ice machines, variable-speed equipment, UV lights, Wi-Fi thermostats, repair, and a detailed 21-point maintenance visit. Florida DBPR separately lists Pablo Cusi Jr. doing business as KEY WEST COOLING COMPANY LLC at the same address under certified air-conditioning contractor license CAC1819077, current and active when checked July 26, 2026. Sunbiz lists the LLC active and the current Monroe County contractor report matches the company, qualifier, and license. Those records resolve identity and credential; they do not guarantee the assigned technician, diagnosis, availability, price, or result. RealReviews found no imported individual review bodies behind the stored Google Places aggregate, so the outside rating remains attributed to Google and is not used to claim recurring sentiment.
Key West Cooling Company: what to know
RealReviews editorial research · checked 2026-07-26Put Key West Cooling Company on the shortlist when you want a Key West office, a state credential that resolves to the same company address, and a maintenance scope you can compare line by line. CAC1819077 and the outside 4.9 rating do not prove that a proposed repair is correct. The deciding evidence is the job record: the failed condition, the measurement behind the diagnosis, the accepted equipment and trade boundary, the full price, and the result after testing.
Four records point to the same Key West contractor
The official site gives 410 Avenue E, 305-912-2293, and Monday-through-Friday hours. Florida DBPR places Pablo Cusi Jr., the DBA KEY WEST COOLING COMPANY LLC, and certified air-conditioning contractor license CAC1819077 at that address; the record was current and active when checked. Sunbiz also lists the LLC active at 410 Avenue E, while Monroe County's July 24 active-contractor report pairs the company, Cusi, and the same license. That four-way match is materially stronger identity evidence than a directory name alone.
Use the match to police the paperwork, not to skip job-level verification. The contracting name and CAC1819077 should appear on the proposal. If another company or subcontractor will perform part of the work, name it and its responsibility. When the refrigerant circuit will be opened, identify the technician assigned to covered work and confirm the applicable EPA Section 608 credential. Recheck the state and county records near signing because the records can change.
Read the maintenance receipt, not just the checklist
Key West Cooling publishes 21 maintenance checks. The list reaches from thermostat calibration and filters through fan-motor voltage and amperage, bearings, the accessible indoor coil, drain treatment, condenser coil, operating refrigerant pressure, safeties, disconnect, connections, contactors, exposed wiring, capacitors, fan blade, service valves, supply-to-return temperature difference, duct loss, compressor draw, and cleanup around the condenser. The useful receipt adds the missing verbs and numbers. A motor line gets its reading. A coil line says inspected, cleaned, or quoted. A drain line distinguishes treatment from clearing an existing blockage. A pressure entry is not automatically a leak search or a refrigerant charge. Ask about filters and inaccessible components before the visit, then compare the returned record with the company's published list.
A part name is not the diagnosis
Suppose the invoice says “replaced capacitor.” That tells you what went into the unit, but not why. The useful line is the reading that condemned the old part and the operating result after the new one went in. The same problem appears when an invoice says “added refrigerant.” Record the refrigerant and quantity, then ask where the lost charge is thought to have gone.
Before dispatch, send the model and serial plus the few things you can actually observe: the thermostat display, which fan runs, water or odor, and a tripped breaker. Afterward, keep the diagnosis, repair price, after-hours charge, warranty, and exclusions together. A number separated from its scope is hard to dispute and impossible to compare.
Replacement is a different decision. The proposal should identify the indoor and outdoor equipment and explain why repair lost the comparison: a failed compressor, an unavailable component, a repeat leak, a mismatch, or cost. If the existing equipment can remain safely in service, a second written diagnosis is reasonable before it is discarded.
Ask how the installer selected capacity for this house. ENERGY STAR notes that oversizing can produce short cycling and poor comfort. The final scope still has to settle ducts and airflow, drainage, electrical work, support or tie-down, permits, startup readings, registration, disposal, and the labor warranty.
Ductless work is bought from a drawing. Mark every indoor head and outdoor unit, capacity by room, line-set path, gravity or pumped condensate path, circuit and disconnect responsibility, wall finish, support, controls, cleaning access, and startup result. The City checklist calls separately for make, model, tonnage, location, elevation, stand or bracket engineering, AHRI documentation, and a mini-split energy form. One installer may hide a line set while another uses an exterior cover; one may pump condensate while another can preserve gravity fall. The room sketch makes those choices and their restoration consequences visible before the wall is opened.
Pool heaters and ice machines change the dispatch
Before paying a dispatch fee for a pool heater, ask whether the company works on that exact make and model and which side of the appliance it will diagnose. A heater can have sound refrigeration while water flow, automation, power, controls, or gas is at fault. Send a nameplate photo, the visible error, the fuel or electrical arrangement, water-flow condition, automation behavior, and any corrosion. The closeout should state whether the heater produced heat and record the water-temperature change; it should not imply that untested pool equipment was repaired.
An ice machine can be cold and still fail its job. Tell dispatch whether production stopped, the bin or drain is involved, the cubes changed, or a remote condenser is showing the fault. Water and filter condition matter. So does the operating deadline. The restaurant or hotel, not the repair appointment, decides whether existing ice remains usable and who owns sanitation.
Keep adjacent work separate. A duct repair needs a named run, the defect, access, material, insulation, and the test that will close the job. UV equipment needs its product and intended purpose in writing. When a connected thermostat is handed back, the customer should control the account and recovery method; sensor behavior, staging, subscriptions, offline operation, and tenant access should not remain attached to an installer's personal login.
The City checklist makes permit ownership visible
The City of Key West's mechanical checklist makes the installer identify the contractor and qualifier, the equipment make, model and tonnage, and where the equipment will sit. Depending on the job, the packet may also need a duct layout, survey, support or tie-down engineering, AHRI documentation, manufacturer instructions, product approvals, a mini-split energy form, or HOA approval.
There is one useful pricing question here: who owns the permit file from application through a passed inspection? Put filing, plan comments, scheduling, closeout proof, and correction of rejected work under a named party. The checklist also says a project valued at $15,000 or more needs a recorded Notice of Commencement before the first inspection. The Building Department decides what the address and scope actually require.
Give the after-hours caller a dollar ceiling
A vacation-rental call can reach a diagnosis at midnight and still go nowhere. Put one system on the request, name the person who can approve the repair, and give that person a dollar ceiling. Include the safe access window, invoice recipient, and what to do if cooling cannot be restored. Send door, alarm, gate, and lockbox details only through the company's confirmed secure channel.
A maintenance agreement deserves a slower read. Check which assets it covers, how often the company comes, who handles filters, and whether drain or coil work stops at inspection. Then find the exclusions that affect the next bill: refrigerant, chemicals, parts, after-hours work, and repair authority. Hotels, restaurants, and multifamily properties should put an asset ID and notification order on the work order. The visit should end with measurements, exceptions, a recipient, and the name of the next approver.
What the outside 4.9 figure can establish
The identity-aligned Google record stored by RealReviews displayed 4.9 from 189 ratings. RealReviews did not import those review bodies, so this profile cannot test their recency, service mix, authenticity, praise, or complaints. Use the Google link for that evidence. Here, the shortlist case rests on the matched Key West identity, active CAC1819077 record, and published maintenance scope. Equipment acceptance, diagnosis, arrival commitment, and price still require confirmation from the company. A newer license, insurance, office, or service record belongs in the correction or claim path, not in a RealReviews score.
Services listed
13 sourcedWhat we actually checked on July 26
12 source records tied to this Key West business- Editorial research checked 2026-07-26
- 12 approved source records
- Google Places snapshot checked Jul 2026
- Official-site details checked Apr 2026
Those records establish the company identity, the state credential, the Key West address, and the service claims quoted here. They do not tell us how a recent job went. Customer experiences stay separate, and a newer public record can be submitted through the correction link.
What is the equipment doing right now?
Message for Key West Cooling CompanyName the equipment and describe what changed. Add the Key West service address, the deadline, and the best way to reach you. Key West Cooling Company confirms whether it will take the job and what the visit will cost.
Projects and media
1 approved imageFirsthand customer feedback
Open for genuine experiencesIf you hired this business, describe the job and what happened. Add timing or price context only when you can share it; every submission is reviewed before publication.
Sourced business themes
2 themes from attributed profile dataQuestions to ask before hiring
Ask a questionPeople also compare
Nearby profilesControls for Key West Cooling Company's profile
Sources, ownership, and correctionsKeep the hiring record
Save the written scope and warranty with the quote. A correction changes the public profile only after review; an owner claim does not erase criticism or control customer submissions.
RealReviews records the selected request details. The business still confirms availability, price, and acceptance.
